Floodplain Risk Management Advisory Committee

2018 Wagga Wagga Revised Murrumbidgee River Floodplain Risk Management Study and Plan

2012 Oral Histories Project

Main City Levee upgrade project updates

Past flood management studies

Major Overland Flow Floodplain Risk Management Study and Plan (in development)

North Wagga Wagga Levee Options and Third Party Impacts - 2015

2015 Community Information Sessions- Detailed design update and North Wagga Options

Change in depth maps for North Wagga levee options (these maps assume the Main City Levee is already upgraded to a 1 in 100 year level of protection)

Tarcutta, Ladysmith and Uranqunity Village Flood Studies - Final Report (adopted August 2015)

Village Flood Studies 2015 consultation

Review of Environmental Factors

2012 Community Information Sessions

Fact Sheets and Updates

Wagga Wagga Detailed Flood Model Revision - 2014

Proposed Levee Upgrade - Report

Levee concept design report (2011)

Draft Concepts Levee Upgrade - Freeboard Report

Draft Concepts Levee Upgrade - Preliminary Environmental & Planning Overview

Review of Environmental Factors - Adopted documents

Other